TRANSPORT
To ensure speedy and efficient delivery, the C-Hawk Concrete team will survey the site to ensure that the transit mixer trucks will have unimpaired access to the site. Among the factors they will consider are:
- The access road and ground condition up to the discharge point should be safe and good enough for heavy vehicles.
- Sufficient turning space should be provided for the transit mixer to access and leave the delivery point.
- The distances, heights and clearances should be sufficient for moving the equipment.
PUMPING CONCRETE
Pumping is one of the most efficient means of pouring concrete. In many situations-such as in high rise buildings – pumping is the only viable option. At other times, the ease and speed of pumping concrete makes it the most economical method of pouring concrete.